Transporting SDLG Excavators Across Kenya: Weights, Low-Loaders and Site Readiness
Watch — 67 seconds: the complete SDLG range in Kenya
The excavator family this transport guide serves — every SDLG machine in one film from the Ruai yard.
Video not playing? Download it or watch on YouTube — and for a machine of your own, call +254 718 686 967.
An excavator's journey from the Ruai yard to a site in Turkana or the Coast is where machinery meets logistics — and the moves that are surveyed, specified and received properly arrive as machines; the moves that are improvised arrive as insurance claims. This guide covers SDLG excavator transport Kenya end to end: the weight reference discipline, the loading and securing checklist, route and access considerations, excavator delivery site readiness and the handover steps — with permit requirements verified separately against current rules, exactly as the transport authorities change them.
Quick answers if you are planning a move: the transport weight comes from the machine's configuration documentation, the low-loader from the low-bed truck hire guide, the haul pricing from the transport costs per km guide — the transport cost per km Kenya line belongs in every mobilisation budget — and the commissioning discipline in the heavy machine delivery guide; the desk at +254 718 686 967 manages the move door to door.
| The weight discipline | Transport weight and dimensions from the machine's configuration documentation — the reference that specifies the low-loader, never the brochure's general figure |
| The chain | Survey, specify, load and secure, move, receive — five links, each briefed and recorded |
| What is verified, not invented | Permit, escort and axle-load rules change; the permit requirements transport Kenya question is confirmed with the transporter against current requirements before every move — this page invents none |
| The site half | Receiving is half the transport: the pad, the access, the offload plan and the arrival inspection decided before the truck leaves |
| Verification date | 2026-11-03 |
The weight reference: documentation, not memory
The excavator transport weight reference is not a table of numbers — it is a discipline, because the weight that matters is the transport weight of the specific configuration, which the documentation for the build settles. The rows the desk confirms per machine: operating and transport weights from the configuration's documents; the transport dimensions — height with the boom positioned for travel, width across the tracks or blade, length with the stick and bucket stowed; the ground clearance and departure angles that decide the ramp geometry; and any shipping restraints or removal items the transport requires. These figures specify the low-loader, price the move and settle the permits — three jobs that share one source, which is why the source is documentation and never memory. Where a fleet moves machines regularly, the desk keeps the transport sheets on file so every repeat move starts from verified figures.
Loading and securing: the checklist the insurer reads
The loading and securing excavator discipline is the heart of the move. The rows: the loading surface and ramps rated and firm, the machine walked on slowly with a spotter, the boom and stick positioned and lowered for transport, the travel lock engaged, the attachment secured or removed per the plan; the securing itself — chains and binders rated for the load, attached at the designated points, tensioned evenly, the machine settled on its suspension; the clearance check — height, width and overhang measured against the route's limits; and the walkaround record — the securing photographed before departure, the record kept with the transport file. A load secured to the plan arrives as it left; a load secured to habit arrives however habit managed. The plan takes ten extra minutes at the yard and saves ten weeks at the claim.
Route and access: the survey before the booking
The route access heavy equipment rows: the route surveyed against the combination's dimensions and weight — bridge and culvert capacities, gradient and corner geometry, the clearances that govern an over-width or over-height load; the road condition sections flagged where a heavy combination cannot afford surprises; the travel windows and any escort requirements confirmed against current rules; and the access leg at the destination — gate widths, ground bearing for the combination, the offload area's surface and drainage. The survey happens before the low-loader is booked, because the survey's outputs specify the booking. Moves that skip the survey discover its findings with the load aboard — the survey exists precisely because its surprises are priced in tonnes.
Site readiness and handover: the receiving half
The excavator delivery site readiness rows: the offload pad firm, level and cleared, with ground bearing verified for the combination; the offload method briefed — ramps or dock matched to the machine's geometry, the winch or tug plan defined, the exclusion zone marked and manned; the machine's first position on site walked and confirmed; and the arrival inspection ready — the checklist against which the machine is received, photographed and recorded before the crew leaves. Then the machine handover steps: the transport record compared against the machine — every new mark noted; the securing removed and the machine function-checked cold; the fluids and levels confirmed before the first start; the operator briefed on the machine's rows and the file opened with the delivery record. A received machine starts earning the day it arrives; an unreceived one starts its warranty clock anyway, with the transport damage discovered three weeks later at the first fault.
Misuse patterns that cost transport programmes
- The brochure weight: the low-loader specified on a general figure — the combination's margins written down before the move, not during it.
- The habit securing: chains where habit puts them, not where the plan designates — the insurer's first question answered badly.
- The unsurveyed route: the corner or bridge discovered aboard — the survey priced in tonnes, paid in claims.
- The permit from memory: last year's rules applied to this year's move — the requirements verified separately, per move.
- The unreceived delivery: the crew waved off without an inspection — the damage discovered at the first fault, the claim window closed.
Five checks before the truck leaves
- The figures are documented: transport weight and dimensions from the configuration's papers, on file.
- The combination is specified: deck, tractor and securing plan against the documented figures.
- The route is surveyed: geometry, condition, windows and access — with current requirements.
- The site is ready: pad, offload method, exclusion zone and arrival checklist prepared.
- The permits are verified: confirmed with the transporter against current rules for this move.
Working the knowledge with the desk
Send the machine, destination and site details to +254 718 686 967 and the desk manages the move door to door — documented figures, specified combination, surveyed route, prepared site and a received machine with the file opened. The SDLG excavator delivery Kenya conversation rides the same call as the machine quotation, because a machine is bought once and moved for years — and the low loader hire Kenya line belongs in the mobilisation budget from the first plan, not the first breakdown. The moves that are run as a chain arrive as machines; the moves run as a hope arrive as lessons. The desk's job is to make sure the chain never breaks.
Free Download · 14-Slide Presentation
SDLG Heavy Equipment Kenya: 2026 Company & Product Overview (Download the Full Presentation)
Explore the complete SDLG heavy equipment range for Kenya in one professional 14-slide presentation. Compiled by Trust Partners Geo-Group Ltd — the authorized SDLG dealer — this downloadable overview maps every machine family sold and supported locally, from 2.6-tonne compact excavators to the 95-tonne mining flagship and the 10-tonne wheel loader range, together with warranty terms, delivery lead times, financing options and the full sales, hire, parts and contracting support available from the Ruai, Nairobi yard.
What is inside the SDLG product overview presentation
- Crawler excavators — compact 2.6–3.6 t machines, mid-range 13.5–25.5 t workhorses, 30.5–50 t quarry excavators and 65–95 t mining flagships, with long-reach and amphibious specials
- Wheel loaders — the full 1–10 t payload line from compact farm loaders to the L9100H flagship, with quick couplers, pallet forks, grapples and 4-in-1 buckets
- Electric and hybrid machines — battery-electric excavators and loaders for urban, indoor and low-noise applications
- Road machinery — G9138H to G9300H motor graders, the D18H crawler dozer and the B877F backhoe loader
- Compaction equipment — 10–26 t single-drum soil compactors, 3–12 t tandem rollers and the 30 t RP6300 pneumatic roller for sealing work
- Compact track loaders — the STR1000H and TV1100H with dozens of quick-attach tools
- Ownership and support — the 1 year / 2,000 hours factory warranty, about two weeks delivery on stock machines and 8–12 weeks on factory orders, plus parts, service and 24/7 dispatch
| Document | Company & Product Overview — Trust Partners Geo-Group × SDLG |
| Format | PowerPoint (.pptx), 14 slides, landscape |
| Coverage | 40+ SDLG models across eight equipment families, Kenya specifications and applications |
| Prepared by | Trust Partners Geo-Group Ltd — Authorized SDLG Dealer, Kenya |
| Price | Free — no registration required |
Download the SDLG 2026 Product Overview presentation (PowerPoint)
Prefer to talk through the range first? Call or WhatsApp the SDLG desk on +254 718 686 967 — a written quotation follows within 24 hours. Specifications in the presentation are indicative and subject to the official configuration datasheet for each machine.
Frequently asked questions
1. How are SDLG excavators transported across Kenya?
On low-loader combinations specified against the machine's documented transport weight and dimensions, over surveyed routes with current permit and escort requirements confirmed before every move.
2. Where do the transport weights come from?
From the configuration's own documentation — operating and transport weights, dimensions and clearances per build, kept on file for repeat moves.
3. What does the loading and securing checklist include?
Rated ramps and surfaces, the machine positioned and locked for transport, rated chains at designated points tensioned evenly, clearance measurements and a photographed walkaround record before departure.
4. What permits are needed for heavy transport?
They change; the requirements — permits, escorts, axle-load rules and travel windows — are verified with the transporter against current rules for each move, never assumed from last time.
5. What must the site have ready for delivery?
A firm cleared offload pad with verified bearing, a briefed offload method with a manned exclusion zone, the machine's first position walked, and the arrival inspection checklist ready.
6. What happens at handover after transport?
The transport record compared against the machine, securing removed, cold function checks, fluids confirmed, the operator briefed and the file opened with the delivery record — before the crew leaves.
7. How is the transport costed?
Per kilometre against the documented figures and surveyed route — the per-km guide prices the line, and the quotation carries it with the machine.
8. Who manages the move door to door?
The SDLG desk at +254 718 686 967 — machine, destination and site details in, surveyed, specified and received machine out.
Plan your excavator transport with the SDLG desk
Send your machine, destination and site details — we return the documented, surveyed and received delivery plan with the written quotation within 24 hours.
Disclaimer: Transport weights and dimensions come from each configuration's own documentation; permit, escort and axle-load rules change and are verified with the transporter against current requirements for each move — this page invents none. Figures verified 2026-11-03.
Transporting SDLG Excavators Across Kenya: Weights, Low-Loaders and Site Readiness
Watch — 67 seconds: the complete SDLG range in Kenya
The excavator family this transport guide serves — every SDLG machine in one film from the Ruai yard.
Video not playing? Download it or watch on YouTube — and for a machine of your own, call +254 718 686 967.
An excavator's journey from the Ruai yard to a site in Turkana or the Coast is where machinery meets logistics — and the moves that are surveyed, specified and received properly arrive as machines; the moves that are improvised arrive as insurance claims. This guide covers SDLG excavator transport Kenya end to end: the weight reference discipline, the loading and securing checklist, route and access considerations, excavator delivery site readiness and the handover steps — with permit requirements verified separately against current rules, exactly as the transport authorities change them.
Quick answers if you are planning a move: the transport weight comes from the machine's configuration documentation, the low-loader from the low-bed truck hire guide, the haul pricing from the transport costs per km guide — the transport cost per km Kenya line belongs in every mobilisation budget — and the commissioning discipline in the heavy machine delivery guide; the desk at +254 718 686 967 manages the move door to door.
| The weight discipline | Transport weight and dimensions from the machine's configuration documentation — the reference that specifies the low-loader, never the brochure's general figure |
| The chain | Survey, specify, load and secure, move, receive — five links, each briefed and recorded |
| What is verified, not invented | Permit, escort and axle-load rules change; the permit requirements transport Kenya question is confirmed with the transporter against current requirements before every move — this page invents none |
| The site half | Receiving is half the transport: the pad, the access, the offload plan and the arrival inspection decided before the truck leaves |
| Verification date | 2026-11-03 |
The weight reference: documentation, not memory
The excavator transport weight reference is not a table of numbers — it is a discipline, because the weight that matters is the transport weight of the specific configuration, which the documentation for the build settles. The rows the desk confirms per machine: operating and transport weights from the configuration's documents; the transport dimensions — height with the boom positioned for travel, width across the tracks or blade, length with the stick and bucket stowed; the ground clearance and departure angles that decide the ramp geometry; and any shipping restraints or removal items the transport requires. These figures specify the low-loader, price the move and settle the permits — three jobs that share one source, which is why the source is documentation and never memory. Where a fleet moves machines regularly, the desk keeps the transport sheets on file so every repeat move starts from verified figures.
Loading and securing: the checklist the insurer reads
The loading and securing excavator discipline is the heart of the move. The rows: the loading surface and ramps rated and firm, the machine walked on slowly with a spotter, the boom and stick positioned and lowered for transport, the travel lock engaged, the attachment secured or removed per the plan; the securing itself — chains and binders rated for the load, attached at the designated points, tensioned evenly, the machine settled on its suspension; the clearance check — height, width and overhang measured against the route's limits; and the walkaround record — the securing photographed before departure, the record kept with the transport file. A load secured to the plan arrives as it left; a load secured to habit arrives however habit managed. The plan takes ten extra minutes at the yard and saves ten weeks at the claim.
Route and access: the survey before the booking
The route access heavy equipment rows: the route surveyed against the combination's dimensions and weight — bridge and culvert capacities, gradient and corner geometry, the clearances that govern an over-width or over-height load; the road condition sections flagged where a heavy combination cannot afford surprises; the travel windows and any escort requirements confirmed against current rules; and the access leg at the destination — gate widths, ground bearing for the combination, the offload area's surface and drainage. The survey happens before the low-loader is booked, because the survey's outputs specify the booking. Moves that skip the survey discover its findings with the load aboard — the survey exists precisely because its surprises are priced in tonnes.
Site readiness and handover: the receiving half
The excavator delivery site readiness rows: the offload pad firm, level and cleared, with ground bearing verified for the combination; the offload method briefed — ramps or dock matched to the machine's geometry, the winch or tug plan defined, the exclusion zone marked and manned; the machine's first position on site walked and confirmed; and the arrival inspection ready — the checklist against which the machine is received, photographed and recorded before the crew leaves. Then the machine handover steps: the transport record compared against the machine — every new mark noted; the securing removed and the machine function-checked cold; the fluids and levels confirmed before the first start; the operator briefed on the machine's rows and the file opened with the delivery record. A received machine starts earning the day it arrives; an unreceived one starts its warranty clock anyway, with the transport damage discovered three weeks later at the first fault.
Misuse patterns that cost transport programmes
- The brochure weight: the low-loader specified on a general figure — the combination's margins written down before the move, not during it.
- The habit securing: chains where habit puts them, not where the plan designates — the insurer's first question answered badly.
- The unsurveyed route: the corner or bridge discovered aboard — the survey priced in tonnes, paid in claims.
- The permit from memory: last year's rules applied to this year's move — the requirements verified separately, per move.
- The unreceived delivery: the crew waved off without an inspection — the damage discovered at the first fault, the claim window closed.
Five checks before the truck leaves
- The figures are documented: transport weight and dimensions from the configuration's papers, on file.
- The combination is specified: deck, tractor and securing plan against the documented figures.
- The route is surveyed: geometry, condition, windows and access — with current requirements.
- The site is ready: pad, offload method, exclusion zone and arrival checklist prepared.
- The permits are verified: confirmed with the transporter against current rules for this move.
Working the knowledge with the desk
Send the machine, destination and site details to +254 718 686 967 and the desk manages the move door to door — documented figures, specified combination, surveyed route, prepared site and a received machine with the file opened. The SDLG excavator delivery Kenya conversation rides the same call as the machine quotation, because a machine is bought once and moved for years — and the low loader hire Kenya line belongs in the mobilisation budget from the first plan, not the first breakdown. The moves that are run as a chain arrive as machines; the moves run as a hope arrive as lessons. The desk's job is to make sure the chain never breaks.
Free Download · 14-Slide Presentation
SDLG Heavy Equipment Kenya: 2026 Company & Product Overview (Download the Full Presentation)
Explore the complete SDLG heavy equipment range for Kenya in one professional 14-slide presentation. Compiled by Trust Partners Geo-Group Ltd — the authorized SDLG dealer — this downloadable overview maps every machine family sold and supported locally, from 2.6-tonne compact excavators to the 95-tonne mining flagship and the 10-tonne wheel loader range, together with warranty terms, delivery lead times, financing options and the full sales, hire, parts and contracting support available from the Ruai, Nairobi yard.
What is inside the SDLG product overview presentation
- Crawler excavators — compact 2.6–3.6 t machines, mid-range 13.5–25.5 t workhorses, 30.5–50 t quarry excavators and 65–95 t mining flagships, with long-reach and amphibious specials
- Wheel loaders — the full 1–10 t payload line from compact farm loaders to the L9100H flagship, with quick couplers, pallet forks, grapples and 4-in-1 buckets
- Electric and hybrid machines — battery-electric excavators and loaders for urban, indoor and low-noise applications
- Road machinery — G9138H to G9300H motor graders, the D18H crawler dozer and the B877F backhoe loader
- Compaction equipment — 10–26 t single-drum soil compactors, 3–12 t tandem rollers and the 30 t RP6300 pneumatic roller for sealing work
- Compact track loaders — the STR1000H and TV1100H with dozens of quick-attach tools
- Ownership and support — the 1 year / 2,000 hours factory warranty, about two weeks delivery on stock machines and 8–12 weeks on factory orders, plus parts, service and 24/7 dispatch
| Document | Company & Product Overview — Trust Partners Geo-Group × SDLG |
| Format | PowerPoint (.pptx), 14 slides, landscape |
| Coverage | 40+ SDLG models across eight equipment families, Kenya specifications and applications |
| Prepared by | Trust Partners Geo-Group Ltd — Authorized SDLG Dealer, Kenya |
| Price | Free — no registration required |
Download the SDLG 2026 Product Overview presentation (PowerPoint)
Prefer to talk through the range first? Call or WhatsApp the SDLG desk on +254 718 686 967 — a written quotation follows within 24 hours. Specifications in the presentation are indicative and subject to the official configuration datasheet for each machine.
Frequently asked questions
1. How are SDLG excavators transported across Kenya?
On low-loader combinations specified against the machine's documented transport weight and dimensions, over surveyed routes with current permit and escort requirements confirmed before every move.
2. Where do the transport weights come from?
From the configuration's own documentation — operating and transport weights, dimensions and clearances per build, kept on file for repeat moves.
3. What does the loading and securing checklist include?
Rated ramps and surfaces, the machine positioned and locked for transport, rated chains at designated points tensioned evenly, clearance measurements and a photographed walkaround record before departure.
4. What permits are needed for heavy transport?
They change; the requirements — permits, escorts, axle-load rules and travel windows — are verified with the transporter against current rules for each move, never assumed from last time.
5. What must the site have ready for delivery?
A firm cleared offload pad with verified bearing, a briefed offload method with a manned exclusion zone, the machine's first position walked, and the arrival inspection checklist ready.
6. What happens at handover after transport?
The transport record compared against the machine, securing removed, cold function checks, fluids confirmed, the operator briefed and the file opened with the delivery record — before the crew leaves.
7. How is the transport costed?
Per kilometre against the documented figures and surveyed route — the per-km guide prices the line, and the quotation carries it with the machine.
8. Who manages the move door to door?
The SDLG desk at +254 718 686 967 — machine, destination and site details in, surveyed, specified and received machine out.
Plan your excavator transport with the SDLG desk
Send your machine, destination and site details — we return the documented, surveyed and received delivery plan with the written quotation within 24 hours.
Disclaimer: Transport weights and dimensions come from each configuration's own documentation; permit, escort and axle-load rules change and are verified with the transporter against current requirements for each move — this page invents none. Figures verified 2026-11-03.