Bill of Quantities Preparation
BOQ Format and Measurement Standards
NCA licensed quantity surveyors with 15+ years experience in BOQ preparation and construction measurement across Kenya. Accurate quantities, fair pricing.
What is a Bill of Quantities (BOQ)?
A Bill of Quantities (BOQ) is a document listing all materials, parts, and labor required for a construction project, with quantities and rates for pricing. It is the foundation of transparent tendering and fair contract administration.
In Kenya's construction industry, the BOQ is essential for comparing contractor bids on equal basis, providing a fair basis for interim payments, and managing variations during construction.
Before BOQ preparation, ensure you have completed your cost estimation and understand your project management requirements.
Standard BOQ Format in Kenya
The standard BOQ format in Kenya follows CESMM4 (Civil Engineering Standard Method of Measurement) or SMM7 (Standard Method of Measurement of Building Works), depending on project type.
BOQ Structure
- Preliminaries: General conditions, site setup, insurances
- Preambles: Material and workmanship specifications
- Measured Works: Items measured from drawings
- Prime Cost Sums: Allowances for specific items
- Provisional Sums: Contingency allowances
- General Summary: Collection of sections with totals
Item Description Standards
- Standardized Wording: Clear, unambiguous descriptions
- Units: m, m², m³, tonnes, nr, item, sum
- Specification Reference: Linked to specifications
- Measurement Rules: Net quantities unless stated otherwise
Common Units
| Unit | Description | Example |
|---|---|---|
| m | Linear meter | Pipes, cables, kerbs |
| m² | Square meter | Plaster, painting, paving |
| m³ | Cubic meter | Concrete, excavation, fill |
| tonne | Metric tonne | Steel reinforcement |
| nr | Number | Doors, windows, manholes |
BOQ Preparation Process
BOQ preparation requires systematic measurement from drawings, application of measurement rules, and clear item descriptions.
Preparation Steps
- Obtain Drawings: Architectural, structural, and services drawings
- Study Scope: Understand project and identify work sections
- Take Off Quantities: Measure from drawings (manual or software)
- Apply Measurement Rules: CESMM or SMM7 as applicable
- Write Descriptions: Standardized, clear wording
- Arrange Sections: Logical grouping of work
- Add Preliminaries: General project requirements
- Include Sums: Prime cost and provisional sums
- Prepare Summary: Collection and totals
- Check and Review: Verify accuracy and completeness
Measurement Software
- CostX: Professional quantity takeoff
- PlanSwift: Digital measurement from PDF
- Bluebeam: PDF measurement and markup
- Excel: Manual measurement and pricing
For earthworks measurement details, see our guide on bulk earthworks volume calculation.
Preliminaries in BOQ
Preliminaries cover general project requirements not specific to any work section. They are essential for contractor pricing and project management.
Fixed Preliminaries
- Site Setup: Offices, storage, fencing, utilities
- Insurances: Contractor all-risk, public liability
- Bonds: Performance bond, advance payment bond
- Site Supervision: Project manager, site agent, foreman
- Health and Safety: Compliance, PPE, safety officer
Time-Related Preliminaries
- Site Accommodation: Maintenance and rental
- Plant Standing: Cranes, excavators on site
- Scaffolding: Erection, maintenance, dismantling
- Temporary Works: Formwork, falsework, dewatering
Preliminaries Pricing
- Typical Percentage: 10-20% of project cost
- Underestimating: Causes contractor losses
- Overestimating: Reduces competitiveness
- Accurate Assessment: Based on actual project duration
Measurement Rules
Standard measurement rules ensure consistency and fairness in quantity measurement. Different work types have specific measurement rules.
Earthworks Measurement
- Excavation: Measured in m³, classified by material type
- Classification: Soft soil, hard soil, rock (separate items)
- Depth: Separate items for different depth ranges
- Working Space: Measured separately where required
- Batter: Sloping sides measured separately
Concrete Measurement
- Concrete: Measured in m³ net volume
- Reinforcement: Measured in tonnes
- Formwork: Measured in m² contact area
- Finishes: Measured in m²
Measurement Principles
- Net Quantities: No allowance for waste or bulking
- Separate Items: Different materials, sizes, locations
- Clear Boundaries: No overlap between items
- Complete Coverage: All work included
Prime Cost and Provisional Sums
Prime Cost (PC) and Provisional Sums are allowances in the BOQ for specific items or contingencies. Understanding the difference is essential for contract administration.
Prime Cost (PC) Sums
- Definition: Allowance for specific items supplied by client or nominated supplier
- Examples: Sanitary ware, kitchen equipment, special doors
- Contractor Adds: Handling and profit percentage
- Adjustment: Based on actual cost
Provisional Sums
- Definition: Allowance for work not fully detailed at tender
- Examples: Unforeseen ground, statutory authority work
- Adjustment: Based on actual cost or instruction
- Contingency: For unknown conditions
Key Differences
| Aspect | Prime Cost Sum | Provisional Sum |
|---|---|---|
| Purpose | Specific item allowance | Contingency allowance |
| Definition | Known item, unknown price | Unknown work |
| Adjustment | Actual cost | Instruction or actual |
| Contractor Profit | Percentage on handling | Percentage if instructed |
Need BOQ Preparation for Your Project?
Trust Partners provides professional Bill of Quantities preparation across Kenya. Accurate measurement, clear descriptions, and fair pricing basis.
WhatsApp Us 📞 Tap to Call: +254 718 68 69 67Frequently Asked Questions
📖 Related Reading
Machine hour rate calculation methods.
Planning, scheduling and cost control.
Cut and fill balance optimization.
Complete library of project planning guides.
Trust Partners Geo-Group Ltd
NCA licensed quantity surveying contractor. Serving Nairobi, Nakuru, Eldoret, Kisumu & Mombasa. About us.
Bill of Quantities Preparation
BOQ Format and Measurement Standards
NCA licensed quantity surveyors with 15+ years experience in BOQ preparation and construction measurement across Kenya. Accurate quantities, fair pricing.
What is a Bill of Quantities (BOQ)?
A Bill of Quantities (BOQ) is a document listing all materials, parts, and labor required for a construction project, with quantities and rates for pricing. It is the foundation of transparent tendering and fair contract administration.
In Kenya's construction industry, the BOQ is essential for comparing contractor bids on equal basis, providing a fair basis for interim payments, and managing variations during construction.
Before BOQ preparation, ensure you have completed your cost estimation and understand your project management requirements.
Standard BOQ Format in Kenya
The standard BOQ format in Kenya follows CESMM4 (Civil Engineering Standard Method of Measurement) or SMM7 (Standard Method of Measurement of Building Works), depending on project type.
BOQ Structure
- Preliminaries: General conditions, site setup, insurances
- Preambles: Material and workmanship specifications
- Measured Works: Items measured from drawings
- Prime Cost Sums: Allowances for specific items
- Provisional Sums: Contingency allowances
- General Summary: Collection of sections with totals
Item Description Standards
- Standardized Wording: Clear, unambiguous descriptions
- Units: m, m², m³, tonnes, nr, item, sum
- Specification Reference: Linked to specifications
- Measurement Rules: Net quantities unless stated otherwise
Common Units
| Unit | Description | Example |
|---|---|---|
| m | Linear meter | Pipes, cables, kerbs |
| m² | Square meter | Plaster, painting, paving |
| m³ | Cubic meter | Concrete, excavation, fill |
| tonne | Metric tonne | Steel reinforcement |
| nr | Number | Doors, windows, manholes |
BOQ Preparation Process
BOQ preparation requires systematic measurement from drawings, application of measurement rules, and clear item descriptions.
Preparation Steps
- Obtain Drawings: Architectural, structural, and services drawings
- Study Scope: Understand project and identify work sections
- Take Off Quantities: Measure from drawings (manual or software)
- Apply Measurement Rules: CESMM or SMM7 as applicable
- Write Descriptions: Standardized, clear wording
- Arrange Sections: Logical grouping of work
- Add Preliminaries: General project requirements
- Include Sums: Prime cost and provisional sums
- Prepare Summary: Collection and totals
- Check and Review: Verify accuracy and completeness
Measurement Software
- CostX: Professional quantity takeoff
- PlanSwift: Digital measurement from PDF
- Bluebeam: PDF measurement and markup
- Excel: Manual measurement and pricing
For earthworks measurement details, see our guide on bulk earthworks volume calculation.
Preliminaries in BOQ
Preliminaries cover general project requirements not specific to any work section. They are essential for contractor pricing and project management.
Fixed Preliminaries
- Site Setup: Offices, storage, fencing, utilities
- Insurances: Contractor all-risk, public liability
- Bonds: Performance bond, advance payment bond
- Site Supervision: Project manager, site agent, foreman
- Health and Safety: Compliance, PPE, safety officer
Time-Related Preliminaries
- Site Accommodation: Maintenance and rental
- Plant Standing: Cranes, excavators on site
- Scaffolding: Erection, maintenance, dismantling
- Temporary Works: Formwork, falsework, dewatering
Preliminaries Pricing
- Typical Percentage: 10-20% of project cost
- Underestimating: Causes contractor losses
- Overestimating: Reduces competitiveness
- Accurate Assessment: Based on actual project duration
Measurement Rules
Standard measurement rules ensure consistency and fairness in quantity measurement. Different work types have specific measurement rules.
Earthworks Measurement
- Excavation: Measured in m³, classified by material type
- Classification: Soft soil, hard soil, rock (separate items)
- Depth: Separate items for different depth ranges
- Working Space: Measured separately where required
- Batter: Sloping sides measured separately
Concrete Measurement
- Concrete: Measured in m³ net volume
- Reinforcement: Measured in tonnes
- Formwork: Measured in m² contact area
- Finishes: Measured in m²
Measurement Principles
- Net Quantities: No allowance for waste or bulking
- Separate Items: Different materials, sizes, locations
- Clear Boundaries: No overlap between items
- Complete Coverage: All work included
Prime Cost and Provisional Sums
Prime Cost (PC) and Provisional Sums are allowances in the BOQ for specific items or contingencies. Understanding the difference is essential for contract administration.
Prime Cost (PC) Sums
- Definition: Allowance for specific items supplied by client or nominated supplier
- Examples: Sanitary ware, kitchen equipment, special doors
- Contractor Adds: Handling and profit percentage
- Adjustment: Based on actual cost
Provisional Sums
- Definition: Allowance for work not fully detailed at tender
- Examples: Unforeseen ground, statutory authority work
- Adjustment: Based on actual cost or instruction
- Contingency: For unknown conditions
Key Differences
| Aspect | Prime Cost Sum | Provisional Sum |
|---|---|---|
| Purpose | Specific item allowance | Contingency allowance |
| Definition | Known item, unknown price | Unknown work |
| Adjustment | Actual cost | Instruction or actual |
| Contractor Profit | Percentage on handling | Percentage if instructed |
Need BOQ Preparation for Your Project?
Trust Partners provides professional Bill of Quantities preparation across Kenya. Accurate measurement, clear descriptions, and fair pricing basis.
WhatsApp Us 📞 Tap to Call: +254 718 68 69 67Frequently Asked Questions
📖 Related Reading
Machine hour rate calculation methods.
Planning, scheduling and cost control.
Cut and fill balance optimization.
Complete library of project planning guides.