Every fuel figure you've ever been quoted was born in conditions somebody chose. That's why this page publishes no litres-per-hour league table — it publishes the SDLG fuel efficiency comparison method: a field-test protocol any Kenyan site can run so that a SDLG vs CAT fuel consumption Kenya claim, or a SDLG vs Komatsu fuel efficiency claim, becomes a measurement instead of a marketing line.
Quick answers if you are planning a test: a fair test needs six controls — equivalent machines and configurations, the same task and material, operator rotation, a defined duty cycle, fill-to-fill fuel measurement, and matched hours — and a record sheet disciplined enough to survive an engineer's questions. The honest outputs are litres per hour, litres per tonne, and cost per hour, each dated and signed. The desk at +254 718 686 967 will help you structure a construction equipment fuel test method on your own site, and the brand-comparison context sits on the comparison hub, with like-for-like costing worked in the excavator cost-per-hour comparison.
| The six controls | Equivalent machines · same task and material · operator rotation · defined duty cycle · fill-to-fill measurement · matched hours |
| The honest outputs | Litres/hour · litres/tonne · cost/hour — dated, signed, reproducible |
| What this page does NOT do | Publish unverified fuel figures — a SDLG fuel consumption Kenya number without test conditions attached is a rumour, not data |
| Equipment needed | Metered bowser or calibrated flow meter · identical tanks filled to the same neck · hour meters · weighbridge or certified load estimates |
| Verification date | 2026-11-03 |
Why fuel claims fail
An excavator fuel consumption test Kenya contractors can trust dies the moment conditions differ. A machine digging wet clay uphill against a machine free-digging dry sand is not a comparison — it's two different jobs wearing brand badges. The usual failure list: unmatched machine classes (a 20-tonne against a 25-tonne), different bucket configurations, one operator with twenty years and another with two, idling counted on one machine and not the other, and fuel read from a gauge instead of a meter. Each error alone can move the result by double digits; together they make the league table fiction. The method below removes them one at a time.
The six controls, specified
- Equivalent machines: same size class, same age band, same configuration — bucket type and capacity, tyres or tracks, work tools. Compare verified datasheets, not model names.
- Same task and material: one defined cycle — dig, swing, load, return — in the same material, moisture and face. If the material differs, the test compares soils, not machines.
- Operator rotation: each operator runs each machine for equal blocks; the operator effect is then averaged out instead of baked in.
- Defined duty cycle: engine hours split into digging, idle and travel, recorded per machine — because idle hours are where honest fuel consumption per hour construction equipment numbers go to die.
- Fill-to-fill measurement: tanks filled to the same visible neck point before and after each shift block; or a calibrated meter on the supply line. Gauge readings are estimates; fill levels are evidence.
- Matched hours: equal productive hours per machine, same shifts, same weather window — or the results carry a weather disclaimer.
The protocol: a day that produces defensible numbers
Morning: machines inspected and filled to the neck, hour meters photographed, operators briefed on the identical cycle. Blocks: each operator runs each machine in alternating order, the clerk logs cycle counts and idle time each hour. Midday: no refuelling unless the protocol records it. End: refill to the same neck point — the litres drawn per machine are the day's fuel consumption; the weighbridge tickets or certified load counts give tonnes. Divide, and you have the three honest outputs. Run the day twice — different operators, same protocol — and if the ranking flips, the test says the honest thing: the difference between these machines, on this site, is inside the noise.
What the results mean
Litres per hour answers the cash question; litres per tonne answers the productivity question; cost per hour folds in fuel price, and the SDLG cost per hour Kenya conversation starts there — with the owning and maintenance side worked alongside, as the total-cost framework and the parts-cost method describe. A fuel advantage of a few percent rarely overturns a purchase on its own; a double-digit, reproducible advantage on your material is a negotiating fact. Both deserve the same discipline: the CAT vs SDLG operating cost Kenya file is built from dated tests, not brochures, and any figure this campaign ever quotes will carry its test conditions with it.
The printable field-test sheet
| Field | Record this |
|---|---|
| Date / site / material | Weather, moisture, face description |
| Machine 1 / Machine 2 | Model, serial, configuration, hour-meter start |
| Operators | Names, experience, rotation order and blocks |
| Duty-cycle log | Digging / idle / travel hours per machine per block |
| Fuel | Fill-to-neck litres per machine; meter readings if fitted |
| Production | Cycle counts, weighbridge tickets or certified load counts |
| Results | L/hr, L/tonne, KES/hr — computed, dated, signed |
Five checks before you trust any figure
- The six controls: all six specified on the sheet, not assumed.
- The machines: verified, configuration-matched datasheets for every contender.
- The measurement: fill-to-fill or metered — no gauge estimates.
- The repetition: at least two days, rotated operators, ranking stable or the difference declared inside the noise.
- The disclosure: conditions published with the figure — or the figure stays a rumour.
From test result to buying decision
Bring the sheet to the desk. A reproducible fuel advantage on your material becomes a written quotation conversation — machine, configuration and the duty cycle your test measured — while an honest 'no measurable difference' is equally valuable: it moves the decision to the numbers that did differ, purchase price, parts, service and resale, which the comparison cluster works methodically. Either way, the wheel loader fuel consumption Kenya and excavator numbers that guide your fleet will be yours, measured on your site, and nobody else's marketing.
Free Download · 14-Slide Presentation
SDLG Heavy Equipment Kenya: 2026 Company & Product Overview (Download the Full Presentation)
Explore the complete SDLG heavy equipment range for Kenya in one professional 14-slide presentation. Compiled by Trust Partners Geo-Group Ltd — the authorized SDLG dealer — this downloadable overview maps every machine family sold and supported locally, from 2.6-tonne compact excavators to the 95-tonne mining flagship and the 10-tonne wheel loader range, together with warranty terms, delivery lead times, financing options and the full sales, hire, parts and contracting support available from the Ruai, Nairobi yard.
What is inside the SDLG product overview presentation
- Crawler excavators — compact 2.6–3.6 t machines, mid-range 13.5–25.5 t workhorses, 30.5–50 t quarry excavators and 65–95 t mining flagships, with long-reach and amphibious specials
- Wheel loaders — the full 1–10 t payload line from compact farm loaders to the L9100H flagship, with quick couplers, pallet forks, grapples and 4-in-1 buckets
- Electric and hybrid machines — battery-electric excavators and loaders for urban, indoor and low-noise applications
- Road machinery — G9138H to G9300H motor graders, the D18H crawler dozer and the B877F backhoe loader
- Compaction equipment — 10–26 t single-drum soil compactors, 3–12 t tandem rollers and the 30 t RP6300 pneumatic roller for sealing work
- Compact track loaders — the STR1000H and TV1100H with dozens of quick-attach tools
- Ownership and support — the 1 year / 2,000 hours factory warranty, about two weeks delivery on stock machines and 8–12 weeks on factory orders, plus parts, service and 24/7 dispatch
| Document | Company & Product Overview — Trust Partners Geo-Group × SDLG |
| Format | PowerPoint (.pptx), 14 slides, landscape |
| Coverage | 40+ SDLG models across eight equipment families, Kenya specifications and applications |
| Prepared by | Trust Partners Geo-Group Ltd — Authorized SDLG Dealer, Kenya |
| Price | Free — no registration required |
Download the SDLG 2026 Product Overview presentation (PowerPoint)
Prefer to talk through the range first? Call or WhatsApp the SDLG desk on +254 718 686 967 — a written quotation follows within 24 hours. Specifications in the presentation are indicative and subject to the official configuration datasheet for each machine.
Frequently asked questions
1. What is the fuel consumption of an SDLG machine in Kenya?
There is no honest universal figure — consumption depends on model, configuration, material, duty cycle and operator. This page gives you the method to measure it on your site instead of quoting a rumour.
2. How do I compare SDLG vs CAT fuel consumption fairly?
Run the six controls: equivalent machines, same task and material, operator rotation, defined duty cycle, fill-to-fill measurement and matched hours — then publish litres per hour and litres per tonne with the conditions.
3. Does a few percent fuel difference matter?
A small difference rarely decides a purchase alone; a double-digit, reproducible advantage on your material is a negotiating fact. Fold it into cost per hour beside price, parts, service and resale.
4. What equipment do I need for a fuel test?
A metered bowser or calibrated flow meter, identical fill points, hour meters and a weighbridge or certified load counts — plus the printable sheet on this page.
5. How many days does a fair test take?
At least two days with rotated operators; if the ranking flips between days, the honest conclusion is that the difference is inside the noise.
6. Who can help me run a test on my site?
The SDLG desk at +254 718 686 967 — protocol reviewed, configurations matched to verified datasheets, and quotations for the contenders within 24 hours.
7. Why doesn't this page publish a fuel league table?
Because unconditioned figures mislead. Every litre-per-hour number this campaign ever quotes will carry its test conditions, date and site — or it will not be quoted.
8. Where does fuel fit in total cost per hour?
Beside ownership, finance, parts, service and operator — the comparison hub and the cost-per-hour guides build the full picture from dated evidence.
Run your fuel test with the SDLG desk
Send your site and machine shortlist — we structure the protocol, match verified configurations and price written quotations within 24 hours.
Disclaimer: This article publishes a method, not fuel figures — any litre-per-hour number without dated test conditions is excluded from this campaign by policy. Machine comparisons require verified, configuration-matched datasheets; finance terms are lender-specific and verified at application. Figures verified 2026-11-03.
SDLG vs CAT and Komatsu Fuel Efficiency: A Fair Field-Test Method for Kenyan Sites
Watch — 67 seconds: the complete SDLG range in Kenya
The machine at the centre of your fuel test — every SDLG family in one film from the Ruai yard.
Video not playing? Download it or watch on YouTube — and for a machine of your own, call +254 718 686 967.
Every fuel figure you've ever been quoted was born in conditions somebody chose. That's why this page publishes no litres-per-hour league table — it publishes the SDLG fuel efficiency comparison method: a field-test protocol any Kenyan site can run so that a SDLG vs CAT fuel consumption Kenya claim, or a SDLG vs Komatsu fuel efficiency claim, becomes a measurement instead of a marketing line.
Quick answers if you are planning a test: a fair test needs six controls — equivalent machines and configurations, the same task and material, operator rotation, a defined duty cycle, fill-to-fill fuel measurement, and matched hours — and a record sheet disciplined enough to survive an engineer's questions. The honest outputs are litres per hour, litres per tonne, and cost per hour, each dated and signed. The desk at +254 718 686 967 will help you structure a construction equipment fuel test method on your own site, and the brand-comparison context sits on the comparison hub, with like-for-like costing worked in the excavator cost-per-hour comparison.
| The six controls | Equivalent machines · same task and material · operator rotation · defined duty cycle · fill-to-fill measurement · matched hours |
| The honest outputs | Litres/hour · litres/tonne · cost/hour — dated, signed, reproducible |
| What this page does NOT do | Publish unverified fuel figures — a SDLG fuel consumption Kenya number without test conditions attached is a rumour, not data |
| Equipment needed | Metered bowser or calibrated flow meter · identical tanks filled to the same neck · hour meters · weighbridge or certified load estimates |
| Verification date | 2026-11-03 |
Why fuel claims fail
An excavator fuel consumption test Kenya contractors can trust dies the moment conditions differ. A machine digging wet clay uphill against a machine free-digging dry sand is not a comparison — it's two different jobs wearing brand badges. The usual failure list: unmatched machine classes (a 20-tonne against a 25-tonne), different bucket configurations, one operator with twenty years and another with two, idling counted on one machine and not the other, and fuel read from a gauge instead of a meter. Each error alone can move the result by double digits; together they make the league table fiction. The method below removes them one at a time.
The six controls, specified
- Equivalent machines: same size class, same age band, same configuration — bucket type and capacity, tyres or tracks, work tools. Compare verified datasheets, not model names.
- Same task and material: one defined cycle — dig, swing, load, return — in the same material, moisture and face. If the material differs, the test compares soils, not machines.
- Operator rotation: each operator runs each machine for equal blocks; the operator effect is then averaged out instead of baked in.
- Defined duty cycle: engine hours split into digging, idle and travel, recorded per machine — because idle hours are where honest fuel consumption per hour construction equipment numbers go to die.
- Fill-to-fill measurement: tanks filled to the same visible neck point before and after each shift block; or a calibrated meter on the supply line. Gauge readings are estimates; fill levels are evidence.
- Matched hours: equal productive hours per machine, same shifts, same weather window — or the results carry a weather disclaimer.
The protocol: a day that produces defensible numbers
Morning: machines inspected and filled to the neck, hour meters photographed, operators briefed on the identical cycle. Blocks: each operator runs each machine in alternating order, the clerk logs cycle counts and idle time each hour. Midday: no refuelling unless the protocol records it. End: refill to the same neck point — the litres drawn per machine are the day's fuel consumption; the weighbridge tickets or certified load counts give tonnes. Divide, and you have the three honest outputs. Run the day twice — different operators, same protocol — and if the ranking flips, the test says the honest thing: the difference between these machines, on this site, is inside the noise.
What the results mean
Litres per hour answers the cash question; litres per tonne answers the productivity question; cost per hour folds in fuel price, and the SDLG cost per hour Kenya conversation starts there — with the owning and maintenance side worked alongside, as the total-cost framework and the parts-cost method describe. A fuel advantage of a few percent rarely overturns a purchase on its own; a double-digit, reproducible advantage on your material is a negotiating fact. Both deserve the same discipline: the CAT vs SDLG operating cost Kenya file is built from dated tests, not brochures, and any figure this campaign ever quotes will carry its test conditions with it.
The printable field-test sheet
| Field | Record this |
|---|---|
| Date / site / material | Weather, moisture, face description |
| Machine 1 / Machine 2 | Model, serial, configuration, hour-meter start |
| Operators | Names, experience, rotation order and blocks |
| Duty-cycle log | Digging / idle / travel hours per machine per block |
| Fuel | Fill-to-neck litres per machine; meter readings if fitted |
| Production | Cycle counts, weighbridge tickets or certified load counts |
| Results | L/hr, L/tonne, KES/hr — computed, dated, signed |
Five checks before you trust any figure
- The six controls: all six specified on the sheet, not assumed.
- The machines: verified, configuration-matched datasheets for every contender.
- The measurement: fill-to-fill or metered — no gauge estimates.
- The repetition: at least two days, rotated operators, ranking stable or the difference declared inside the noise.
- The disclosure: conditions published with the figure — or the figure stays a rumour.
From test result to buying decision
Bring the sheet to the desk. A reproducible fuel advantage on your material becomes a written quotation conversation — machine, configuration and the duty cycle your test measured — while an honest 'no measurable difference' is equally valuable: it moves the decision to the numbers that did differ, purchase price, parts, service and resale, which the comparison cluster works methodically. Either way, the wheel loader fuel consumption Kenya and excavator numbers that guide your fleet will be yours, measured on your site, and nobody else's marketing.
Free Download · 14-Slide Presentation
SDLG Heavy Equipment Kenya: 2026 Company & Product Overview (Download the Full Presentation)
Explore the complete SDLG heavy equipment range for Kenya in one professional 14-slide presentation. Compiled by Trust Partners Geo-Group Ltd — the authorized SDLG dealer — this downloadable overview maps every machine family sold and supported locally, from 2.6-tonne compact excavators to the 95-tonne mining flagship and the 10-tonne wheel loader range, together with warranty terms, delivery lead times, financing options and the full sales, hire, parts and contracting support available from the Ruai, Nairobi yard.
What is inside the SDLG product overview presentation
- Crawler excavators — compact 2.6–3.6 t machines, mid-range 13.5–25.5 t workhorses, 30.5–50 t quarry excavators and 65–95 t mining flagships, with long-reach and amphibious specials
- Wheel loaders — the full 1–10 t payload line from compact farm loaders to the L9100H flagship, with quick couplers, pallet forks, grapples and 4-in-1 buckets
- Electric and hybrid machines — battery-electric excavators and loaders for urban, indoor and low-noise applications
- Road machinery — G9138H to G9300H motor graders, the D18H crawler dozer and the B877F backhoe loader
- Compaction equipment — 10–26 t single-drum soil compactors, 3–12 t tandem rollers and the 30 t RP6300 pneumatic roller for sealing work
- Compact track loaders — the STR1000H and TV1100H with dozens of quick-attach tools
- Ownership and support — the 1 year / 2,000 hours factory warranty, about two weeks delivery on stock machines and 8–12 weeks on factory orders, plus parts, service and 24/7 dispatch
| Document | Company & Product Overview — Trust Partners Geo-Group × SDLG |
| Format | PowerPoint (.pptx), 14 slides, landscape |
| Coverage | 40+ SDLG models across eight equipment families, Kenya specifications and applications |
| Prepared by | Trust Partners Geo-Group Ltd — Authorized SDLG Dealer, Kenya |
| Price | Free — no registration required |
Download the SDLG 2026 Product Overview presentation (PowerPoint)
Prefer to talk through the range first? Call or WhatsApp the SDLG desk on +254 718 686 967 — a written quotation follows within 24 hours. Specifications in the presentation are indicative and subject to the official configuration datasheet for each machine.
Frequently asked questions
1. What is the fuel consumption of an SDLG machine in Kenya?
There is no honest universal figure — consumption depends on model, configuration, material, duty cycle and operator. This page gives you the method to measure it on your site instead of quoting a rumour.
2. How do I compare SDLG vs CAT fuel consumption fairly?
Run the six controls: equivalent machines, same task and material, operator rotation, defined duty cycle, fill-to-fill measurement and matched hours — then publish litres per hour and litres per tonne with the conditions.
3. Does a few percent fuel difference matter?
A small difference rarely decides a purchase alone; a double-digit, reproducible advantage on your material is a negotiating fact. Fold it into cost per hour beside price, parts, service and resale.
4. What equipment do I need for a fuel test?
A metered bowser or calibrated flow meter, identical fill points, hour meters and a weighbridge or certified load counts — plus the printable sheet on this page.
5. How many days does a fair test take?
At least two days with rotated operators; if the ranking flips between days, the honest conclusion is that the difference is inside the noise.
6. Who can help me run a test on my site?
The SDLG desk at +254 718 686 967 — protocol reviewed, configurations matched to verified datasheets, and quotations for the contenders within 24 hours.
7. Why doesn't this page publish a fuel league table?
Because unconditioned figures mislead. Every litre-per-hour number this campaign ever quotes will carry its test conditions, date and site — or it will not be quoted.
8. Where does fuel fit in total cost per hour?
Beside ownership, finance, parts, service and operator — the comparison hub and the cost-per-hour guides build the full picture from dated evidence.
Run your fuel test with the SDLG desk
Send your site and machine shortlist — we structure the protocol, match verified configurations and price written quotations within 24 hours.
Disclaimer: This article publishes a method, not fuel figures — any litre-per-hour number without dated test conditions is excluded from this campaign by policy. Machine comparisons require verified, configuration-matched datasheets; finance terms are lender-specific and verified at application. Figures verified 2026-11-03.